Checklist

Gutter Clearing & Unblocking checklist

Use this checklist to brief whoever is doing the work, or to inspect it afterwards. It is the same list our teams work from, and the last section covers the spots that get skipped most often.

Gutter Clearing & Unblocking checklist

Core checklist

Every item here is in scope on a standard gutter clearing & unblocking visit from us.

  • Pole camera used to find the blockage before anything is touched
  • Moss, silt, nesting material and leaf packs vacuumed out from the ground
  • Full water flush so you can see the run draining
  • Hopper heads and outlets cleared, not just the visible channel
  • Photos of the run before and after, sent the same day
  • Any split joint or dropped bracket flagged for repair rather than patched over

Commonly skipped areas

These are the places a rushed job leaves behind. Check them before you sign anything off.

  • Skirting boards behind furniture
  • Tops of doors and door frames
  • Extractor grilles and vent covers
  • Radiator backs and valves
  • Light switches, sockets and handles
  • Window tracks, sills and frames

What each surface needs

Matching chemistry to surface is what protects finishes. This is what we reach for and why.

  • Gutter vacuum with carbon fibre pole sections
  • Pole-mounted wireless inspection camera
  • Water flush from a fed pole to prove flow
  • Hand clearance from a tower where a run is too packed to vacuum

Who this checklist suits

Anyone with water already coming over the edge of a gutter, staining a wall or dripping behind a downpipe.

The service behind this guide

Blocked runs cleared out and proven to flow again before we leave.

See Gutter Clearing & Unblocking

5.0 Google Rating

Verified reviews

Insured £5M

Public liability

15+ Years

Local experience

Family Run

100% local team

Questions people ask

Can I add items to the checklist?

Yes. Send us your own list or your agent's inventory and we quote against that instead of ours.

Do you leave a copy of the completed checklist?

Yes — a signed-off checklist is provided on request, and we can send photographs for empty properties.

Is anything on this list charged as an extra?

No. Everything under the core checklist is included in the quoted price for this service.

CallFree Quote